This project involved evaluation of the design of a large (>200,000 SF) medical product manufacturing facility as proposed by an engineering firm retained by the owner prior to involvement by ACS. Upon technical evaluation, ACS determined the design was inappropriate in terms of its ability to reliably and cost effectively deliver the performance required by the owner. ACS assisted the owner in retaining a replacement engineering firm to redesign the HVAC and process piping systems. ACS acted as the owner’s agent to collaborate with the new engineering firm to redesign the manufacturing facility and the central utility plant (including cogeneration) that served that facility.